Utility

Setup Converter

Bring an older saved setup up to date. Load a .json file exported from the Dome or Roll-Off-Roof calculator; this page reads what build wrote it, explains what changed since, applies those changes, and hands back an updated file to download. Your measurements are never touched — only the saved pointing is normalised where an older convention needs it. Everything runs in your browser; nothing is uploaded.

or drop a .json setup here

What this converts

Saved setups carry a small _meta.schema number that is raised only when the meaning of a saved field changes — not on every release. This page walks a file from whatever schema it was written under up to the current one, one step at a time.

Schema 2 — pointing normalised to the rest position

Setups written before v8.12 stored their pointing under the old rule where the mount changed pier sides on its own. People keep those files for the measurements, not the pointing, and an old one often re-opens with the counterweight level or in the air — which is not where any mount rests, and reads as the model being broken. This step brings a German equatorial pointing to rest: hour angle −90° (shaft hanging), flipping the pier side if the counterweight would otherwise end up above horizontal. A pointing already at rest, and mounts with no counterweight (Alt/Az, fork, or a harmonic mount run without one), are left exactly as saved. Measurements are never altered.